Site Search

Earthworks

  • New guidance seeks to limit earthworks to a maximum of 600mm above or below existing ground level.
  • Erosion and sediment control plans are to be submitted with development applications (except where soil disturbance is insignificant).
  • This guideline is included in Divisions B to H.
Never miss an update
account_circle
mail_outline
* We'll never share your email with third parties